Customization: | Available |
---|---|
Material: | Sandwich Panel |
Frame: | Steel Structure |
Still deciding? Get samples of US$ 1/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1 | Metal carving board: polyurethane sandwich outer wall board (support custom) |
2 | Double toughened glass(support custom) |
3 | Embedded line |
4 | Flooring:MGO / Spc Floor(support custom) |
5 | Waterproof cloth |
6 | Color steel plate, asphalt shingles(support custom) |
7 | Thermal insulation rock wool board |
8 | socket(AU/EUR/US Standard) |
9 | Heavy steel structure |
We always insist on quality first and prompt delivery
By plane | 25 days to your local airport |
By express | Fedex/DHL/UPS/TNT/EMS about 5-7days |
Sea transport | 25-30 days to the destination port |
FAQ
1.How much manpower and time does it take to install the container?
2 hours + 4 workers=1 unit
2.What tools and equipment do I need to prepare for the installation of container?
Crane, hand saw, hand drill, hexagonal screwdriver, rubber hammer, utility knife,hole saw, non-slip gloves, glass glue gun, tape measure, medical box, marker, foot ladder, spirit level.
3.How many days is your fastest lead time?
This depends on the quantity. If it is a regular size, our lead time is generally 7-15 days after receiving the deposit.
4.Can you customize colors?
We are happy to accept color customization. The regular color of our boxes is white, which is popular and well received by customers all over the world. You can also provide the color card number for our reference. What color do you like?
5.What is the largest size that can be made?
The maximum can be 4m*8m, and the 8m surface is equipped with wind-resistant columns to support the top and bottom beams. What kind of functions and requirements are you based on?
6.What is your payment method?
Our payment method is generally TT (wire transfer), 30% deposit, and the remaining 70% paid before shipment.
7.Does your product leak water?
There are quite a number of domestic manufacturers, due to lack of professionalism and irresponsibility for quality, which leads to the problem of water leakage in the box. So far, our company has never experiencedwater leakage problems in overseas orders.
8.Do you need a foundation?
If the land will not subside, there is basically no need to lay foundations. According to different geological conditions, our company will provide guidance and suggestions. If you buy container from us, we will give you complete foundation drawings and we will have video instructions for installation.
9.Can I add an extra roof please?
Roofs can be added, and we can send you some pictures of roofing cases we have done before for your selection and reference. Do you want to add a roof based on wind resistance requiremen